200kva generator set price with AC three phase alternator
Basic Info
Model No.: OCL200
Product Description
Model: 6CTA8.3-G2
Origin: Manufactured by Dongfeng Engine Co., Ltd
Start Model: DC24V electric start
Steady Speed Droop:≤1%
6 cylinders ,in-line,4 stroke Engine Technical Datasheet
In-line, 6 Cylinder, 4 Cycle, Turbo Intercooler Diesel Engine | |
Bore×Stroke | 114mm×135mm |
Displacement | 8.3 Liters |
Compression Ration | 16.5:1 |
Rated Speed | 1500r/min (1800r/min) |
Rated Power | 163kW(175kW) |
Standby Power | 180kW(190kW) |
Fuel Injection Pump | PB Injection Pump |
Governor | Electrical Governor |
Steady Speed Droop | ≤1%(Electrical Governor)) |
Lubricant Capacity | 24 Liters |
Coolant Capacity | 12.3 Liters(Engine Only) |
Net Weight | 629 kg |
Wet Weight | 666kg |
Overall Dimension(L×W×H) | 1128mm×740mm×1084mm |
Coolant Intake Size | Φ50mm |
Coolant Outlet Size | Φ57mm |
Flywheel/Flywheel Housing | SAE2#/SAE2# |
Cooling Way | Positive Water Cooling Cycle |
Speed | 1500r/min(50Hz) | 1800r/min(60Hz) |
Output Power | Engine Output | Engine Output |
Standby Power | 180kW | 190kW |
Prime Power | 163kW | 175kW |
a.It takes about 1 hour by car/taxi,it is about 58 kilometer
b.Or take the subway from JiChangNan station to HanXiChangLong Station(you need to transfer at the TiYuXiLu station to PanYu direction), then take a taxi to Oripo, it will take about 1.5 hour
2.From Canton fair complex to Oripo
a. It takes about 30 minutes by car / taxi, it is about 32 kilometer
b. Take the subway from XinGangDong Station / PaZhou station to HanXiChangLong Station, then take a taxi to Oripo, It will take about 1 hour
Standard Parts: New brand Electric governor Jointventure Engine and 100% copper brushless self excited Alternator Based fuel tank for 8 hours working (silent type only) Single-bearing generator again drops; Intelligent LED display control panel (Smartgen 6110) Speed governor & CHNT brand MCCB(Air circuit breaker) Emergency stop button Electric start and 24v charger; Standard air filter, oil filter, fuel filter;Cooling water tank; High-efficient silencer Exhaust elbow & Storage battery Steel base-frame against vibration; Soft pipe for fuel and handle for lube going-out; Operation& Maintenance manual. Tool kit | |||||||||
Optional parts: 1, Jacket water heater 2, oil heater 3, Diesel heater 4, Parallel connection cabinet system 5,ATS | |||||||||
Price based on FOB Foshan/Guangzhou,china | |||||||||
Payment terms: By T/T 30% in advance and the balance 70% shall be paid before shipment. | |||||||||
Quotation valid : within one month from the date of quote | |||||||||
Package: 1 set packed by plyfilm (If pack by plywood, need to added charges accordingly) | |||||||||
Delivery time:on about 20days |
Product Categories : Open type diesel generator set
Premium Related Products